Project Delivery and the CM Role
Program and Project Management →The project life cycle, the five delivery methods, and the single distinction the exam tests hardest: agency CM versus CM at-risk.
What you should be able to do
- Name the five CMAA project phases in order
- Match a delivery method to an owner's risk and control profile
- Explain what changes legally when a CM at-risk sets a GMP
Key terms
Conception / Design / Procurement / Construction / Post-Construction · Design-Bid-Build · Design-Build · CM at-Risk · CM Agency · Integrated Project Delivery · Guaranteed Maximum Price · Fiduciary duty
Key Concepts Project Life Cycle: Conception, Design, Procurement, Construction, Post Construction Delivery Methods: DBB (Design Bid Build), DB (Design Build), CM at Risk, CM Agency, IPD Contract Types: Lump Sum, GMP, Cost Plus, Unit Price, Time and Materials…
Read the full section
The complete study guide is part of premium, along with 450+ practice questions, the timed simulation and the CPM trainer — $49 for 12 months.
See premium